.
Install Method for Floor Heating: A&B Panel Step-by-Step Guide
Company
HOYA ONDOL – Australia
ABOUT HOYA ONDOL
HOYA ONDOL – Global Network
Product
HOYA ONDOL- Panels
HOYA ONDOL – Heat Pumps
HOYA ONDOL – Hot Water Heating Mat
HOYA ONDOL – SPC Flooring
HOYA ONDOL – Patents / Certificates
HOYA ONDOL – Quality Test Reports
Install Methods
Installation Method – A & B Panels
Installation Method – B Panels
Install Examples
Projects
HOYA ONDOL – Korean Projects
HOYA ONDOL – Australian Projects
Videos
HOYA ONDOL – Videos
Support
Contact Us
How to Buy
1300 137 407
sales@hoyaondol.com.au
1300 137 407
sales@hoyaondol.com.au
Company
HOYA ONDOL – Australia
ABOUT HOYA ONDOL
HOYA ONDOL – Global Network
Product
HOYA ONDOL- Panels
HOYA ONDOL – Heat Pumps
HOYA ONDOL – Hot Water Heating Mat
HOYA ONDOL – SPC Flooring
HOYA ONDOL – Patents / Certificates
HOYA ONDOL – Quality Test Reports
Install Methods
Installation Method – A & B Panels
Installation Method – B Panels
Install Examples
Projects
HOYA ONDOL – Korean Projects
HOYA ONDOL – Australian Projects
Videos
HOYA ONDOL – Videos
Support
Contact Us
How to Buy
Installation procedures A and B Panels
1
Preparation for installation
Plan the best layout for the floor heating pipe.
Clean the floor.
Lay the insulation sheets if required.
2
Install the bottom panels of HOYA ONDOL
Start laying the panels.
Lay panels side by side along the edge of a wall in the most appropriate orientation.
Continue to lay panels across the rest of the floor.
Note: Take care to align panels accurately.
3
Install the Pex(PE-RT) pipe
The size of the pipe is 12mm(ID) and 16mm(OD).
Roll out the pipe pushing it into the channels of the bottom panels.
Unroll the pipe hand over hand to avoid twisting.
Do not kink the pipe by trying to make a very tight turn.
The pipe should run start and finish at the manifold, by fitting the manifold in place before laying the pipe.
Allow sufficient pipe for cutting and fitting at a later stage.
4
Install the top panels of HOYA ONDOL
Snap-fit the top and bottom panels.
Use the rubber mallet hammer for easy work.
5
Connect the pipes to the manifold
Connect the pipes to the manifold by using coupling sockets.
Be careful not to kink the pipes.
6
Connect the boiler
Connect the manifold to the boiler by certified engineer according to the local regulation.
7
Completion of installation
Commissioning.
8
Install the flooring material
HOYA ONDOL is the unique hydronic radiant system
for easy installation and energy saving.
Learn More
Innovation for hydronic radiant
heating system
DIY Assembly Package Product
How Different Quality on HOYA ONDOL
Terms of use
Privacy policy
GO